Resource allocation in stochastic project networks
WSC '71 Proceedings of the 5th conference on Winter simulation
Proactive algorithms for job shop scheduling with probabilistic durations
Journal of Artificial Intelligence Research
Hi-index | 0.00 |
This paper presents simulation procedures for efficiently obtaining estimates of the distribution function, or parameters thereof, of the maximal flow-time through directed acyclic networks whose activity times are random variables.