WSC '96 Proceedings of the 28th conference on Winter simulation
The use of simulation in the optimization of a cellular manufacturing system
WSC '96 Proceedings of the 28th conference on Winter simulation
Use of simulation in optimization of maintenance policies
Proceedings of the 30th conference on Winter simulation
Simulation optimization of air traffic delay cost
Proceedings of the 30th conference on Winter simulation
Proceedings of the 30th conference on Winter simulation
The use of simulation and design of experiments for productivity improvement in the sawmill industry
WSC '04 Proceedings of the 36th conference on Winter simulation
A simulation approach to airline maintenance manpower planning
Proceedings of the 2010 Summer Computer Simulation Conference
Hi-index | 0.01 |
The objective of this article is to present the results obtained after using a simulation optimization methodology applied to a production line from a secondary manufacturing wood processing plant of a well known Chilean mill. For this reason a simulation model constructed in ARENA, was integrated to a genetic algorithms heuristic. The results obtained show that using a different configuration of the plant resources, it is possible to reduce the total average cycle time in 18%. The resource configuration needed to reach this result was obtained evaluating just 1.6% of the total number of possible combinations.