International Journal of Human-Computer Studies - Special issue: real-world applications of uncertain reasoning
On an on-line scheduling problem for parallel jobs
Information Processing Letters
Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods
Journal of Scheduling
WSC '05 Proceedings of the 37th conference on Winter simulation
Proceedings of the 38th conference on Winter simulation
Fuzzy rule generation for adaptive scheduling in a dynamic manufacturing environment
Applied Soft Computing
Intelligent production control decision support system for flexible assembly lines
Expert Systems with Applications: An International Journal
Modeling and real-time scheduling of semiconductor manufacturing line based on simulation
LSMS'07 Proceedings of the Life system modeling and simulation 2007 international conference on Bio-Inspired computational intelligence and applications
Multi criteria preventive maintenance scheduling through arena based simulation modeling
Winter Simulation Conference
Engineering Applications of Artificial Intelligence
Real time performance measurement for batch chemical plants
Proceedings of the Winter Simulation Conference
Manual assembly line operator scheduling using hierarchical preference aggregation
Proceedings of the Winter Simulation Conference
Hi-index | 0.00 |
A simulation-based real-time scheduling mechanism for dynamic discrete manufacturing is presented in this paper. Modified mean flow time performance for different scheduling approaches is compared through off-line simulation experiments, under dynamic manufacturing environments that are subjects to disturbances such as machine breakdowns. These experimental results are used as reference indices for the real-time scheduling mechanism to select the better scheduling approaches for further evaluation based on the actual manufacturing conditions. Discrete-event simulation is used on-line to evaluate the selected approaches and the corresponding schedules to determine the best solution. The selected schedule is used until the deviation of actual performance from the estimated one exceeds a given limit, or when a major event occurs. A new simulation is then performed with the remaining operations to select a new schedule.