IEEE Transactions on Very Large Scale Integration (VLSI) Systems - Special issue on low-power design
Project Scheduling Under Partially Renewable Resource Constraints
Management Science
Cooperative co-evolutionary optimization of software project staff assignments and job scheduling
SSBSE'11 Proceedings of the Third international conference on Search based software engineering
Computers and Operations Research
Why the virtual nature of software makes it ideal for search based optimization
FASE'10 Proceedings of the 13th international conference on Fundamental Approaches to Software Engineering
Search-based software engineering: Trends, techniques and applications
ACM Computing Surveys (CSUR)
Not going to take this anymore: multi-objective overtime planning for software engineering projects
Proceedings of the 2013 International Conference on Software Engineering
Exact scalable sensitivity analysis for the next release problem
ACM Transactions on Software Engineering and Methodology (TOSEM)
Hi-index | 0.00 |
In this paper we develop a heuristic algorithm, based on Scatter Search, for project scheduling problems under partially renewable resources. This new type of resource can be viewed as a generalization of renewable and non-renewable resources, and is very helpful in modelling conditions that do no fit into classical models, but which appear in real timetabling and labor scheduling problems. The Scatter Search algorithm is tested on existing test instances and obtains the best results known so far.