Two-stage no-wait scheduling models with setup and removal times separated
Computers and Operations Research
Scheduling Aircraft Landings--The Static Case
Transportation Science
Metaheuristics in combinatorial optimization: Overview and conceptual comparison
ACM Computing Surveys (CSUR)
Scheduling aircraft landings to balance workload of ground staff
Computers and Industrial Engineering
Aircraft landing problems with aircraft classes
Journal of Scheduling
Hi-index | 0.00 |
We propose a job-shop scheduling model with sequence dependent set-up times and release dates to coordinate both inbound and outbound traffic flows on all the prefixed routes of an airport terminal area and all aircraft operations at the runway complex. The proposed model is suitable for representing several operational constraints (e.g., longitudinal and diagonal separations in specific airspace regions), and different runway configurations (e.g., crossing, parallel, with or without dependent approaches) in a uniform framework. The complexity and the highly dynamic nature of the problem call for heuristic approaches. We propose a fast dynamic local search heuristic algorithm for the job-shop model suitable for considering one of the different performance criteria and embedding aircraft position shifting control technique to limit the controllers/pilots' workload. Finally, we describe in detail the experimental analysis of the proposed model and algorithm applied to two real case studies of Milan-Malpensa and Rome-Fiumicino airport terminal areas.