Time management in the DoD high level architecture
PADS '96 Proceedings of the tenth workshop on Parallel and distributed simulation
Parallel and Distribution Simulation Systems
Parallel and Distribution Simulation Systems
Time management in distributed factory simulation, a case study using HLA
WSC '05 Proceedings of the 37th conference on Winter simulation
Distributed simulation in industry - a real-world necessity or ivory tower fancy?: panel
Proceedings of the 39th conference on Winter simulation: 40 years! The best is yet to come
Hierarchical distributed simulation for 300mm wafer fab
Proceedings of the 39th conference on Winter simulation: 40 years! The best is yet to come
Improving performance by replicating simulations with alternative synchronization approaches
Proceedings of the 40th Conference on Winter Simulation
Hi-index | 0.00 |
Distributed simulation is attractive for modeling complicated manufacturing systems having many tools and products, such as a semiconductor wafer fabrication line. However, conservative synchronization approaches can introduce excessive overhead in execution, and result in little parallelism, which can eliminate the speedup promised by distributed simulation. Our experiences in building a distributed simulation model for 300mm wafer fab using the High Level Architecture (HLA) shows that using model specific information in a novel adaptation of conservative synchronization can achieve very significant reduction in model execution time. This paper defines the time-chop problem for which this adaptation is effective, and formally develops our optimistic-conservative synchronization scheme.