Topology-aware overlay networks for group communication
NOSSDAV '02 Proceedings of the 12th international workshop on Network and operating systems support for digital audio and video
Scalable application layer multicast
Proceedings of the 2002 conference on Applications, technologies, architectures, and protocols for computer communications
The Ordered Core Based Tree Protocol
INFOCOM '97 Proceedings of the INFOCOM '97. Sixteenth Annual Joint Conference of the IEEE Computer and Communications Societies. Driving the Information Revolution
Analysis of Internet multicast traffic performance considering multicast routing protocol
ICNP '00 Proceedings of the 2000 International Conference on Network Protocols
IEEE/ACM Transactions on Networking (TON)
Overcast: reliable multicasting with on overlay network
OSDI'00 Proceedings of the 4th conference on Symposium on Operating System Design & Implementation - Volume 4
Optimal branching factor for tree-based reliable multicast protocols
Computer Communications
Deployment issues for the IP multicast service and architecture
IEEE Network: The Magazine of Global Internetworking
Hi-index | 0.24 |
This paper studies the system parameters that affect the total cost of managing the multicast group on a router. A Petri net model is first proposed to describe the states and transitions of the multicast group management. Based on this model, a delayed vacation queue, extended from a simple M/M/1 queue, is used to analyze the total cost of the multicast group management under various system conditions. The formal analysis reveals that the total cost of the multicast group management is minimized when a router delays a certain time to send its pruning messages to upstream routers. Furthermore, a formula is derived to calculate the optimal delay time for sending the pruning messages to minimize the multicast group management cost. To validate this cost analysis model, an IP multicast group management module is added to the NS-2 simulator to simulate the IP multicast group management. The simulation results under various system parameters are consistent with the results obtained by formal analyses, validating the proposed cost analysis model.