Fuzzy linear regression with fuzzy intervals
Fuzzy Sets and Systems
S-curve regression model in fuzzy environment
Fuzzy Sets and Systems
Fuzzy least-squares linear regression analysis for fuzzy input-output data
Fuzzy Sets and Systems - Information processing
Stability conditions of fuzzy systems and its application to structural and mechanical systems
Advances in Engineering Software
An approach to fuzzy control of nonlinear systems: stability and design issues
IEEE Transactions on Fuzzy Systems
Hi-index | 0.00 |
This study presented the cash portion of working capital management (WCM) by using the concept of target cash balance and developed a practical model for construction firms in Taiwan for rationalizing the amount of cash and current assets which should be possessed in any point of time. The model developed by Miller and Orr is introduced here for understanding the issues involved. Because the S-curve has unique merits to represent the relationship between project duration and complete progress in practical usage of construction management, based on the technique of Takagi-Sugeno (T-S) fuzzy model, the fuzzy S-curve regression is hereby constructed in this paper.