Two-machine flowshop scheduling with intermediate transportation under job physical space consideration

  • Authors:
  • Hua Gong;Lixin Tang

  • Affiliations:
  • Liaoning Key Laboratory of Manufacturing System and Logistics, The Logistics Institute, Northeastern University, Shenyang 110004, China and College of Science, Shenyang Ligong University, Shenyang ...;Liaoning Key Laboratory of Manufacturing System and Logistics, The Logistics Institute, Northeastern University, Shenyang 110004, China

  • Venue:
  • Computers and Operations Research
  • Year:
  • 2011

Quantified Score

Hi-index 0.01

Visualization

Abstract

In this paper, we study a coordinated production-transportation scheduling problem in a two-machine flowshop environment where a single transporter may carry several jobs simultaneously as a batch between the machines. Each job has its own physical-space requirement while being loaded into the transporter. The goal is to minimize the makespan. For the jobs with the same size of physical space during transportation, we present a heuristic algorithm with an absolute worst-case ratio of 2 and a polynomial-time optimal algorithm for a special case with given job sequence. For the jobs having different size of physical storage space, a heuristic algorithm is constructed with an absolute worst-case ratio of 7/3 and asymptotic worst-case ratio of 20/9. Computational experiments demonstrate that the two heuristic algorithms developed are capable of generating near-optimal solutions quickly.