An investigation into knowledge-based yard crane scheduling for container terminals

  • Authors:
  • Wei Yan;Youfang Huang;Daofang Chang;Junliang He

  • Affiliations:
  • Engineering Research Center of Container Supply Chain Technology of Ministry of Education, Shanghai Maritime University, Shanghai 201306, PR China;Engineering Research Center of Container Supply Chain Technology of Ministry of Education, Shanghai Maritime University, Shanghai 201306, PR China;School of Mechanical Engineering, Shanghai Jiao Tong University, Shanghai 200240, PR China;Engineering Research Center of Container Supply Chain Technology of Ministry of Education, Shanghai Maritime University, Shanghai 201306, PR China

  • Venue:
  • Advanced Engineering Informatics
  • Year:
  • 2011

Quantified Score

Hi-index 0.00

Visualization

Abstract

To resolve the problems of operational efficiency, energy consumption and operational cost of an entire container terminal, the yard crane scheduling secures a crucial position during terminal operational process. Accordingly, it is imperative to develop an efficient yard crane scheduling strategy. In this study, the knowledge acquisition was initially conducted. Subsequently, a knowledge sorting process, including the taxonomic tree generation and organization of acquired knowledge, was completed. Afterwards, the rules were extracted for the purpose of yard crane scheduling. Furthermore, a mechanism was deployed for knowledge reasoning. Consequently, a knowledge-based system was established with regard to yard crane scheduling. To this end, a case study was used to illustrate the proposed knowledge-based system.