Multiple objective programming problems with possibilistic coefficients
Fuzzy Sets and Systems
Scheduling of project networks by job assignment
Management Science
A comparison of fuzzy forecasting and Markov modeling
Fuzzy Sets and Systems
A new fuzzy time-series model of fuzzy number observations
Fuzzy Sets and Systems
On the formalization of fuzzy random variables
Information Sciences: an International Journal - Fuzzy random variables
Genetic Algorithms
Constraint-Based Scheduling
Computers and Intractability: A Guide to the Theory of NP-Completeness
Computers and Intractability: A Guide to the Theory of NP-Completeness
Dynamic Control of Genetic Algorithms Using Fuzzy Logic Techniques
Proceedings of the 5th International Conference on Genetic Algorithms
Scheduling Algorithms
Scheduling parallel jobs to minimize the makespan
Journal of Scheduling
An effective hybrid algorithm for university course timetabling
Journal of Scheduling
Information Sciences: an International Journal
Information Sciences: an International Journal
Scheduling: Theory, Algorithms, and Systems
Scheduling: Theory, Algorithms, and Systems
Fuzzy random renewal process with queueing applications
Computers & Mathematics with Applications
A theoretic and practical framework for scheduling in a stochastic environment
Journal of Scheduling
Fuzzy random renewal reward process and its applications
Information Sciences: an International Journal
Computers in Industry - Special issue: Application of genetics algorithms in industry
A class of multiobjective linear programming model with fuzzy random coefficients
Mathematical and Computer Modelling: An International Journal
A single-period inventory model with fuzzy random variable demand
Mathematical and Computer Modelling: An International Journal
Advanced Engineering Informatics
Hi-index | 0.00 |
The aim of this paper is to deal with resource-constrained multiple project scheduling problems (rc-mPSP) under a fuzzy random environment by a hybrid genetic algorithm with fuzzy logic controller (flc-hGA), to a large-scale water conservancy and hydropower construction project in the southwest region of China, whose main project is a dam embankment. The objective functions in this paper are to minimize the total project time (that is the sum of the completion time for all projects) and to minimize the total tardiness penalty of multiple projects, which is the sum of penalty costs for all the projects. After describing the problem of the working procedure in the project and presenting the mathematical formulation model of a resource-constrained project scheduling problem under a fuzzy random environment, we give some definitions and discuss some properties of fuzzy random variables. Then, a method of solving solution sets of fuzzy random multiple objective programming problems is proposed. Because traditional optimization techniques could not cope with the rc-mPSP under a fuzzy random environment effectively, we present a new approach based on the hybrid genetic algorithm (hGA). In order to improve its efficiency, the proposed method hybridized with the fuzzy logic controller (flc) concept for auto-tuning the GA parameters is presented. For the practical problems in this paper, flc-hGA is proved the most effective and most appropriate compared with other approaches. The computer generated results validate the effectiveness of the proposed model and algorithm in solving large-scale practical problems.