Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints. An application in Nissan's Barcelona Plant

  • Authors:
  • Joaquın Bautista;Alberto Cano;Rocıo Alfaro

  • Affiliations:
  • Nissan Chair - Universitat Politècnica de Catalunya, Avda. Diagonal 647, 08028 Barcelona, Spain;Nissan Chair - Universitat Politècnica de Catalunya, Avda. Diagonal 647, 08028 Barcelona, Spain;Nissan Chair - Universitat Politècnica de Catalunya, Avda. Diagonal 647, 08028 Barcelona, Spain

  • Venue:
  • Expert Systems with Applications: An International Journal
  • Year:
  • 2012

Quantified Score

Hi-index 12.05

Visualization

Abstract

In this paper, we present an extension to the mixed-model sequencing problem with work overload minimisation (MMSP-W) for production lines with serial workstations and parallel homogeneous processors. The extension is intended to meet the industrial need to sequence various products so that the work required and completed at the workstations over time is as constant as possible. Several approaches are proposed to formulate the problem, giving rise to different models. Four models are selected, and their performances are compared after running the Gurobi solver, using instances from the literature and a case study of the Nissan powertrain plant in Barcelona.