Modeling just-in-time production systems: a critical review
WSC '93 Proceedings of the 25th conference on Winter simulation
Pattern Based Vocabulary Building for Effectively SequencingMixed-Model Assembly Lines
Journal of Heuristics
A dynamic part-feeding system for an automotive assembly line
Computers and Industrial Engineering - Supply chain management
Computers and Operations Research
Cyclic Just-In-Time Sequences Are Optimal
Journal of Global Optimization
Production planning to support mixed-model assembly
Computers and Industrial Engineering
The maximum deviation just-in-time scheduling problem
Discrete Applied Mathematics
Genetic algorithms for sequencing problems in mixed model assembly lines
Computers and Industrial Engineering
Proceedings of the 34th conference on Winter simulation: exploring new frontiers
Solving the minmax product rate variation problem (PRVP)as a bottleneck assignment problem
Computers and Operations Research
Algorithms for the car sequencing and the level scheduling problem
Journal of Scheduling
Simulation modeling and analysis of a new mixed model production lines
WSC '05 Proceedings of the 37th conference on Winter simulation
Dynamic programming solution to the batching problem in just-in-time flow-shops
Computers and Industrial Engineering
A multi-objective scatter search for a mixed-model assembly line sequencing problem
Advanced Engineering Informatics
Scheduling Commercial Videotapes in Broadcast Television
Operations Research
A Lagrangean relaxation approach for the mixed-model flow line sequencing problem
Computers and Operations Research
Computers and Industrial Engineering
Heuristics for an industrial car sequencing problem considering paint and assembly shop objectives
Computers and Industrial Engineering
Scheduling Mixed-Model Assembly Lines with Cost Objectives by a Hybrid Algorithm
ICIRA '08 Proceedings of the First International Conference on Intelligent Robotics and Applications: Part II
Solving the Response Time Variability Problem by means of Multi-start and GRASP metaheuristics
Proceedings of the 2008 conference on Artificial Intelligence Research and Development: Proceedings of the 11th International Conference of the Catalan Association for Artificial Intelligence
International Journal of Systems Science
Note: Solving symmetric mixed-model multi-level just-in-time scheduling problems
Discrete Applied Mathematics
Solving the minmax product rate variation problem (PRVP) as a bottleneck assignment problem
Computers and Operations Research
Solving the response time variability problem by means of a psychoclonal approach
Journal of Heuristics
Scheduling aircraft landings to balance workload of ground staff
Computers and Industrial Engineering
A parametric multi-start algorithm for solving the response time variability problem
LSSC'09 Proceedings of the 7th international conference on Large-Scale Scientific Computing
International Journal of Automation and Computing
Expert Systems with Applications: An International Journal
A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems
Mathematical and Computer Modelling: An International Journal
A bicriterion objective for levelling the schedule of a mixed-model, JIT assembly process
Mathematical and Computer Modelling: An International Journal
Operations Research Letters
A simple sequencing algorithm for mixed-model assembly lines in just-in-time production systems
Operations Research Letters
A simple approach to the product rate variation problem via axiomatics
Operations Research Letters
A branch and bound algorithm for the response time variability problem
Journal of Scheduling
Computers and Industrial Engineering
Hi-index | 0.01 |