A comment on “A simple sequencing algorithm for mixed-model assembly lines in just-in-time production systems”

  • Authors:
  • Julian Scott Yeomans

  • Affiliations:
  • Management Science Area, Faculty of Administrative Studies, York University, North York, Ont., Canada M3J 1P3

  • Venue:
  • Operations Research Letters
  • Year:
  • 1994

Quantified Score

Hi-index 0.00

Visualization

Abstract

Recently Ding and Chen (1993) have published an O(nD) heuristic for the level schedule problem in mixed-model just-in-time assembly systems. They compare the results of their heuristic to the previously published procedure, M-A3H2, which they claim is the ''best existing sequencing method in the literature''. This is not, however, the case since several other optimization and heuristic procedures have previously appeared for solving the level schedule problem. This note highlights some of these prior results.