WSC '04 Proceedings of the 36th conference on Winter simulation
Introduction to Computational Optimization Models for Production Planning in a Supply Chain
Introduction to Computational Optimization Models for Production Planning in a Supply Chain
Heuristic approaches for master planning in semiconductor manufacturing
Computers and Operations Research
Towards a supply chain simulation reference model for the semiconductor industry
Proceedings of the Winter Simulation Conference
Proceedings of the Winter Simulation Conference
Hi-index | 0.00 |
In this paper, we consider heuristics for master planning in semiconductor manufacturing. While lead times are typically assumed as fixed in production planning, we use iterative simulation to take load-dependent lead times into account. An AutoSched AP simulation model of a semiconductor supply chain is used for implementing the scheme. Simulation results show that the iterative scheme converges fast and leads to less variable, more profitable production plans compared to planes obtained by the fixed lead time approach.