Rapid modeling tools for manufacturing simulation and analysis
WSC '88 Proceedings of the 20th conference on Winter simulation
Rapid modeling: implications for business planning
WSC '88 Proceedings of the 20th conference on Winter simulation
Modeling manufacturing systems using MANUPLAN and SIMSTARTER &m dash; tutorial (tutorial session)
WSC' 90 Proceedings of the 22nd conference on Winter simulation
Hi-index | 0.00 |
Simulation and modeling needs became apparent early in the design of a Greenfield manufacturing facility, especially in the areas of factory floor design support and in factory floor scheduling. Simulation packages were introduced to this project earlier than normal to help drive the design, rather than waiting for the facility design to drive the system development. Time constraint was another reason for the early development of the prototypes; the models and scheduling systems will be tailored while the factory is brought on line.