The Prince William Sound Risk Assessment

  • Authors:
  • Jason R. W. Merrick;J. René van Dorp;Thomas Mazzuchi;John R. Harrald;John E. Spahn;Martha Grabowski

  • Affiliations:
  • -;-;-;-;-;-

  • Venue:
  • Interfaces
  • Year:
  • 2002

Quantified Score

Hi-index 0.00

Visualization

Abstract

After the grounding of the Exxon Valdez and its subsequent oil spill, all parties with interests in Prince William Sound (PWS) were eager to prevent another major pollution event. While they implemented several measures to reduce the risk of an oil spill, the stakeholders disagreed about the effectiveness of these measures and the potential effectiveness of further proposed measures. They formed a steering committee to represent all the major stakeholders in the oil industry, in the government, in local industry, and among the local citizens. The steering committee hired a consultant team, which created a detailed model of the PWS system, integrating system simulation, data analysis, and expert judgment. The model was capable of assessing the current risk of accidents involving oil tankers operating in the PWS and of evaluating measures aimed at reducing this risk. The risk model showed that actions taken prior to the study had reduced the risk of oil spill by 75 percent, and it identified measures estimated to reduce the accident frequency by an additional 68 percent, including improving the safety-management systems of the oil companies and stationing an enhanced-capability tug, called the Gulf Service, at Hinchinbrook Entrance. In all, various stakeholders made multimillion dollar investments to reduce the risk of further oil spills based on the results of the risk assessment.