Evaluating Software Complexity Measures
IEEE Transactions on Software Engineering
Methodology for Validating Software Metrics
IEEE Transactions on Software Engineering
Metrics for requirements engineering
Selected papers of the sixth annual Oregon workshop on Software metrics
Software engineering: theory and practice
Software engineering: theory and practice
Software process improvement with CMM
Software process improvement with CMM
Environmental scenarios and requirements stability
Proceedings of the International Workshop on Principles of Software Evolution
Software Metrics: A Rigorous and Practical Approach
Software Metrics: A Rigorous and Practical Approach
Requirements Engineering: A Good Practice Guide
Requirements Engineering: A Good Practice Guide
Requirements-Based Estimation of Change Costs
Empirical Software Engineering
Status Report on Software Measurement
IEEE Software
Requirements Management: The Search for Nirvana
IEEE Software
Towards a Framework for Software Measurement Validation
IEEE Transactions on Software Engineering
An Operational Process for Goal-Driven Definition of Measures
IEEE Transactions on Software Engineering
Enhancing Requirements and Change Management through Process Modeling and Measurement
ICRE '00 Proceedings of the 4th International Conference on Requirements Engineering (ICRE'00)
Empirical Studies on Requirement Management Measures
Proceedings of the 26th International Conference on Software Engineering
Empirical Studies on Requirement Management Measures
Proceedings of the 26th International Conference on Software Engineering
The How? When? and What? for the Process of Re-planning for Product Releases
ICSP '09 Proceedings of the International Conference on Software Process: Trustworthy Software Development Processes
Hi-index | 0.00 |
The goal of this research is to demonstrate that a subsetof a set of 38 requirements management measures are goodpredictors of stability and volatility of requirements andchange requests. At the time of writing we have theoreticallyvalidated ten of these 38 measures. We are currentlyplanning and performing an industrial case study where wewant to reach the goal described above.