Guidelines for simulation project success
WSC '94 Proceedings of the 26th conference on Winter simulation
Simulation Modeling and Analysis
Simulation Modeling and Analysis
Designing a simulation study: how to conduct a successful simulation study
Proceedings of the 35th conference on Winter simulation: driving innovation
Increased energy efficiency in a Swedish iron foundry through use of discrete event simulation
Proceedings of the 38th conference on Winter simulation
Simulation-based sustainable manufacturing system design
Proceedings of the 40th Conference on Winter Simulation
PerMIS '09 Proceedings of the 9th Workshop on Performance Metrics for Intelligent Systems
Hi-index | 0.00 |
The electricity market within the European Union was liberalized in 2004, which means that Sweden, together with other countries with generally low electricity prices, will face higher electricity prices. This has triggered research with the aim to help energy-intensive companies reduce their electricity usage and total energy usage as well. This paper introduces a new concept for simulating energy-intensive production. Using specially built simulation models helps companies take more than the time aspect into consideration when planning their production. Often energy and power utilization is an important aspect to consider when planning, since the cost for energy and power usage can be high, especially if a "load subscription" is used and the usage is above the company's subscribed level. The methodology described helps breaking down energy parameters into three groups and gives examples of how the simulation model can be built to take energy and power into consideration.