Analysis of production control methods for semiconductor research and development fabs using simulation

  • Authors:
  • Vikram Ramamurthi;Michael E. Kuhl;Karl D. Hirschman

  • Affiliations:
  • Rochester Institute of Technology, Rochester, NY;Rochester Institute of Technology, Rochester, NY;Rochester Institute of Technology Rochester, NY

  • Venue:
  • WSC '05 Proceedings of the 37th conference on Winter simulation
  • Year:
  • 2005

Quantified Score

Hi-index 0.00

Visualization

Abstract

A semiconductor company must bring technology to the market as soon as its application is deemed feasible to be a leader in the industry. The goal of this paper is to investigate production control methods in semiconductor R&D fabs to minimize the time to market for the aforementioned technology. Simulation models of a representative R&D fab are run with different levels of bottleneck utilization, lot priorities, primary and secondary dispatching strategies and due date tightness as treatment combinations in a formally designed experiment. The fab performance measures are percent on time delivery, average cycle time, standard deviation of cycle time and average work-in-process. Fab characteristics are found to influence the application of dispatching rules. However, several dispatching rules are found to be robust across performance measures.