WIP evolution of a semiconductor factory after a bottleneck workcenter breakdown
Proceedings of the 30th conference on Winter simulation
Proceedings of the 33nd conference on Winter simulation
Proceedings of the 35th conference on Winter simulation: driving innovation
WSC '05 Proceedings of the 37th conference on Winter simulation
Economy of scale effects for large wafer fabs
Proceedings of the 38th conference on Winter simulation
Indirect cycle-time quantile estimation for non-FIFO dispatching policies
Proceedings of the 38th conference on Winter simulation
Winter Simulation Conference
Rule-based scheduling in wafer fabrication with due date-based objectives
Computers and Operations Research
Development and introduction of a combined dispatching policy at a high-mix low-volume ASIC facility
Proceedings of the Winter Simulation Conference
A detailed model for a high-mix low-volume asic fab
Proceedings of the Winter Simulation Conference
Hi-index | 0.01 |
In this paper, we examine the cycle time and on-time delivery performance of a semiconductor wafer fabrication facility (wafer fab) under critical ratio (CR) dispatch regime. It turns out that determining appropriate due dates for this rule is a critical task. We provide a detailed analysis of the wafer fab behavior for a large range of due date values. From the results of the experiments we develop a heuristic for conservative due date estimates.