A new method to determine the tool count of a semiconductor factory using FabSim
WSC '04 Proceedings of the 36th conference on Winter simulation
Simulation based scheduling system in a semiconductor backend facility
Proceedings of the 38th conference on Winter simulation
A comparison of mip-based decomposition techniques and VNS approaches for batch scheduling problems
Winter Simulation Conference
Development and introduction of a combined dispatching policy at a high-mix low-volume ASIC facility
Proceedings of the Winter Simulation Conference
A detailed model for a high-mix low-volume asic fab
Proceedings of the Winter Simulation Conference
Hi-index | 0.00 |
In semiconductor manufacturing facilities, there is often the need to speed up certain product types. This is usually done by either assigning higher priorities or by reducing due dates. In this paper, we study the effects of accelerating one product type by a tighter due date on the on-time delivery performance of the other products manufactured. It turns out that the results depend on the considered factory, its load, and the accelerated product. As a consequence, it will be hard for production planners to find simple rules of thumb for the effects of accelerating products. In general, detailed simulation experiments will be required.