Measurement repository for Scrum-based software development process
CEA'08 Proceedings of the 2nd WSEAS International Conference on Computer Engineering and Applications
Uma estratégia de apoio à institucionalização da usabilidade em ambientes de desenvolvimento ágil
Proceedings of the VIII Brazilian Symposium on Human Factors in Computing Systems
APM3: A Methodology Metamodel for Agile Project Management
Proceedings of the 2009 conference on New Trends in Software Methodologies, Tools and Techniques: Proceedings of the Eighth SoMeT_09
Reconciling software development models: A quasi-systematic review
Journal of Systems and Software
Combining maturity with agility: lessons learnt from a case study
Proceedings of the Fourth Symposium on Information and Communication Technology
Hi-index | 0.00 |
Over the past years, the Capability Maturity Model (CMM) and Capability Maturity Model Integration (CMMI) have been broadly used for assessing organizational maturity and process capability throughout the world [20]. However, the rapid pace of change in information technology has caused increasing frustration to the heavyweight plans, specifications, and other documentation imposed by contractual inertia and maturity model compliance criteria [4]. In light of that, agile methodologies have been adopted to tackle this challenge. The aim of our paper is to present mapping between CMMI and one of these methodologies, Scrum. It shows how Scrum addresses the Project Management Process Areas of CMMI. This is useful for organizations that have their plan-driven process based on the CMMI model and are planning to improve its processes toward agility or to help organizations to define a new project management framework based on both CMMI and Scrum practices.