Optimization of a cycle time and utilization in semiconductor test manufacturing using simulation based, on-line, near-real-time scheduling system

  • Authors:
  • Appa Iyer Sivakumar

  • Affiliations:
  • Gintic Institute of Manufacturing Technology, Nanyang Technological University, 71 Nanyang Drive, 638075, Singapore

  • Venue:
  • Proceedings of the 31st conference on Winter simulation: Simulation---a bridge to the future - Volume 1
  • Year:
  • 1999

Quantified Score

Hi-index 0.01

Visualization

Abstract