The interdisciplinary study of coordination
ACM Computing Surveys (CSUR)
Genre taxonomy: A knowledge repository of communicative actions
ACM Transactions on Information Systems (TOIS)
Participatory Design: Issues and Concerns
Computer Supported Cooperative Work
How a silver bullet may lose its shine
Communications of the ACM - Program compaction
Multilingual communication in electronic meetings
ACM SIGGROUP Bulletin
Flaming in electronic communication
Decision Support Systems
Problem-Solving Oscillations in Complex Engineering Projects
Management Science
Portfolios of Control in Outsourced Software Development Projects
Information Systems Research
The collaborate/integrate business technology strategy
Communications of the ACM - Two decades of the language-action perspective
Journal of Management Information Systems
Supplier involvement in product development in the electronics industry: A case study
Journal of Engineering and Technology Management
Antecedents and performance outcomes of global competence: An empirical investigation
Journal of Engineering and Technology Management
A meetings flow approach for conducting student final-year projects
Journal of Computing Sciences in Colleges
Software engineering education: A study on conducting collaborative senior project development
Journal of Systems and Software
Liminality as Cultural Process for Cultural Change
Organization Science
Stakeholders' roles in virtual project environment: A case study
Journal of Engineering and Technology Management
Progressing to the Center: Coordinating Project Work
Organization Science
Project Management: A Systems Approach to Planning, Scheduling, and Controlling
Project Management: A Systems Approach to Planning, Scheduling, and Controlling
Hi-index | 0.00 |
This paper examines the coordination processes (CPs) in outsourced engineering projects by focusing on two questions: How are these processes shaped in contract-driven projects, and is there an alternative approach that improves inter-organizational control of CPs from the client perspective? In studying these questions, we compare two engineering projects, one of which implements the meetings-flow approach, abbreviated as MFA. The findings suggest that, for effective management of different organizations through various dependent project activities, the CPs require an integrated and institutionalized venue enabled by the client. CPs are shaped between clients and contractors, and they can be improved and sustained by this approach.